At the outset we would like to introduce our company Electrosteel Castings Limited, which is an engineering company, engaged in the business of Water Supply & Sewerage Conveyance infrastructure development.
Corrosion Resistant DUCTILE IRON SPUN PIPES manufactured by the company are used for conveying Water and Sewerage.
In the company’s plant at Khardah, 24 Parganas, West Bengal, India Electrosteel manufactures Ductile Iron pipes as per International standards with in house Mini Blast Furnace facility for preparation of pig iron from iron ore i.e., complete manufacture from ore to pipe. |
Future Plans:
Electrosteel Castings Limited (ECL), a company into the Iron and Steel industry for over 50 years now, was among the first few companies to realize the potential that the state of Jharkhand has on offer. Coking coal one of the major inputs for steel making would be required for a steel plant. Accordingly, Parbatpur block of Jharia Coalfields in Bokaro district of Jharkhand State was allotted to M/s. Electrosteel Casting Ltd. For captive mining and supply of Coking Coal for Steel making for their casting plants and proposed new projects.
We are in the process of obtaining the required statutory clearances for the Mine and have made substantial progress in this regard. We are now at a stage where we are going to finalise the contracts for important activities related to our Opencast Mining Project. |
Tender specs for Parbatpur Opencast Project:
ECL proposes to initiate an Opencast project at Parbatpur Central Block of Jharia coal field located about 25 km from Chas, Bokaro on Chas – Talgharia Road. Details of the Project are as follows:
|
| 1. |
Mining Area : 28ha |
| 2. |
Reserve : 3 Million Tonnes approx. |
| 3. |
No. of coal seams & Thickness: 6, thickness varying from 0.9 m to 3 m |
| 4. |
Max. & Min. depth : 20 m & 150 m BGL |
| 5. |
Average stripping ratio : 1:10 (coal in T/OB in m3). |
| 6. |
Dump distance, Max. dump height, Area : avg. 1.5 km, 60m, 60ha. |
| 7. |
Approach to site: Metalled / Macadam bound 10m wide (min) road. |
| 8. |
Minimum production level: 0.5 MTPA. |
|
| A. Scope of work |
| 1. |
Construction & maintenance of Haul road and road to dump. |
| 2. |
Stripping of soil cover and dumping in separate dump created for the purpose. |
| 3. |
Stripping of OB and dumping at designated waste dump as per agreed dumping plan. |
| 4. |
Stripping of coal seams (occasional Jhama) and deliver it to washery within 1 km from site. |
| 5. |
Complying with all Mining rules and regulations applicable to such project during tenure of contract. |
| 6. |
Complying with all statutory responsibilities applicable to such contract. |
| 7. |
Providing all statutory personnel duly authorized by ECL for supervision of the project. |
| 8. |
Dealing with water and geological disturbances during the course of mining. |
| 9. |
Providing all equipments and machines required for the project. |
| 10. |
Maintaining production level and level of OB removal as per agreed schedule. |
| 11. |
Maintenance of OB dump as per agreed configuration. |
| 12. |
Construction of garland drain, settling tanks, toe wall etc as required. |
| 13. |
Back filling of OB during and after closure of mine as per agreed schedule. |
| 14. |
Spreading of Top soil (from soil dump) over the back filled area. |
|
B. Responsibility of ECL |
| 1. |
Provision of land for opencast project and its associated facilities. |
| 2. |
Provision of Plans, sections, schedules and safety directives as required. |
| 3. |
Marking of Pit area, dump area, Haul Road alignment and other facilities. |
| 4. |
Provision of surface lighting as required. |
| 5. |
Provision of pumps & pipes as required. |
| 6. |
Provision of explosives, detonators and safety fuse as per agreed schedule. |
| 7. |
Periodic survey facility for billing purpose. |
| 8. |
Weighment facility for products at delivery end. |
| 9. |
Provision of adequate space for office, workshop etc. |
| 10. |
Provision of 3 KV / 415 V power 100 m from site. |
|
C. Responsibility of contractor |
| 1. |
All machinery and equipments required for the project to achieve agreed schedule of production and OB removal. |
| 2. |
All equipments and facilities required for complying with safety of the mining operations and maintaining local environment. |
| 3. |
Provision of fuel and lubricants for machineries and equipments. |
| 4. |
Provision of adequate skilled and unskilled manpower for operation and safety of the mine. |
| 5. |
Provision of all statutory personnel (duty authorized by ECL) for operation and safety of the mine. |
| 6. |
Maintaining social harmony in and around the mine. |
| 7. |
Complying with all rules, regulations, directives and statutory obligations applicable at any point during the tenure of contract. |
| 8. |
Installation, operation and maintenance of pumps with electricals and pipe ranges for dealing with water. |
| 9. |
Construction and maintenance of haul roads and dumps as per specification and directives. |
| 10. |
Coal production: OB and soil removal ratio to match with the overall stripping ratio for a particular period except during the initial box cut. |
| 11. |
To backfill the exhausted pit area either from currently excavated OB or from dump. |
|
| D. Payment procedure |
| 1. |
Payment for OB and soil removal will be on solid measurement basis. |
| 2. |
Payment against coal production will be on actual tonnage received at washery. |
| 3. |
Excepting at initial box cut (decided by mutual agreement), payment against coal production will have direct link with overall stripping ratio i.e. smaller figure of OB and soil removed / overall stripping ratio or actual coal produced will be payable for any particular period. |
| 4. |
During initial box cut payment will be made on solid measurement basis. |
| 5. |
Bills will be submitted on fortnightly basis. |
|
E. How to quote
|
| Sl. |
Item |
Unit |
Unit rate at 50 meter vertical interval |
| 1. |
OB+soil removal |
m3 |
|
| 2. |
Coal production |
T |
|
| 3. |
Back filling from dump |
m3 |
|
|
| F. Special terms and conditions |
| 1. |
Contractor has to maintain the quality of coal delivered at washery as per agreed quality schedule. Each dumper / tipper carrying coal will carry record of seam from where it has been loaded. |
| 2. |
Contractor has to ensure that no coal is dumped in waste dump unless it is specifically permitted in writing by Mines manager. |
| 3. |
Jhama or poor quality coal if available has to be dumped in separate stock as decided by Company within the washery premises. Dumping of such coal will require written instruction by manager. |
|